Concrete and formwork
Cotter Dam
The original Cotter Dam, a concrete gravity dam, was completed in 1915 built to a height of 18.6m. It was raised from 1949 – 1951 to a height of 28.5m to accommodate a growing population. It served as Canberra’s primary water source until the 1960’s.
The Smart Concreting App from CCAA
Sometimes it feels like the only way to get a true result on the right weather for concreting is to carry a small weather station around with you. Even if you can access site specific data you might need to phone a friend at NASA to workout your cracking potential through the Evaporation Calculation of E = 5 ([Tc + 18] 2.5 -r [Ta + 18] 2.5 ) (V+4) x 10 -6